The Old Dairy Barn Conversion


This property is a self build project where the owner was looking for a way to keep his heating and hot water costs at a minimum. With a wide range of options available for heating the property a Global Energy Systems 8-18kW Caernarfon was installed. This standalone unit provides all the heating and hot water requirements of the building while keeping running costs low.

The property has under floor heating throughout the ground floor with radiators on the first floor. The heating system is over £500 cheaper to run than alternatives but overall savings are far in excess of that due to the government funded RHI scheme. This property receives over £1,900 a year renewable incentives. This totals a huge estimated pay back of over £13,000 through the duration of the 7 year RHI period.